1)Environmental permit

Green Energy
SOLAR POWER PLANT – CAPACITY OF 5 MW (AC)
The project is planned for an output capacity of 8 MW. Estimated annual production is 11.5 GWh. Property-legal relations are resolved across the entire area – a concession has been obtained on land owned by public-legal entities and is listed in the land registry. Property-legal relations with the access road are resolved.
Price is subject to negotiation. (sale in ready-to-build phase – which is almost achieved)
The seller has stated they intend to sell the entire project.
Status of permits:
2) Location permit
3)Concession right
4)Preliminary electric power consent
5)Construction permit
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182