1)Preliminary electric power permit

Green Energy
SOLAR POWER PLANT – CAPACITY OF 2 MW (AC)
The project is planned for an output capacity of 2 MW AC. Estimated annual production is 2.62 GWh. The project is being developed on private land. Property-legal relations are resolved across the entire area – the land is privately owned.
Price is by agreement (sold in current phase – construction permit remains to be obtained)
Status of permits:
2) Location permit
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182