projects-image
Green Energy

SOLAR POWER PLANT – CAPACITY OF 2 MW (AC)

The project is planned for an output capacity of 2 MW AC. Estimated annual production is 2.62 GWh. The project is being developed on private land. Property-legal relations are resolved across the entire area – the land is privately owned.

Price is by agreement (sold in current phase – construction permit remains to be obtained)

Status of permits:

1)Preliminary electric power permit

2) Location permit

Get in touch

Share your thoughts with us

Address

Trg mladih 7d ,Brcko

Email

info@investinbalkan.com

Phone

049/206-182

logo

Copyright © 2025 All rights reserved Project Pro