projects-image
Green Energy

SOLAR POWER PLANT – CAPACITY OF 8 MW (AC)

The project is planned for an output capacity of 8 MW. Estimated annual production is 12.6 GWh. Property-legal relations are resolved across the entire area – a concession has been obtained on land owned by public-legal entities and is listed in the land registry. Property-legal relations with the access road are resolved.

Price is subject to negotiation. (sale in ready-to-build phase – which has already been achieved)

The seller has stated they intend to sell the entire project.

Status of permits:

1)Environmental permit

2) Location permit

3)Concession right

4)Preliminary electric power consent

5)Construction permit

Get in touch

Share your thoughts with us

Address

Trg mladih 7d ,Brcko

Email

info@investinbalkan.com

Phone

049/206-182

logo

Copyright © 2025 All rights reserved Project Pro