1)Environmental permit – not required for this project (official statement)

SOLAR POWER PLANT, CAPACITY OF 14 MW (AC)
The project is planned for an output capacity of 14 MW AC. The project is divided into smaller power plants (up to 1 MW). Estimated annual production is 21.28 GWh. The project is being developed on private land parcels. Note: the owner is a well-known investor in the region and has already built and commissioned many solar power plant projects. Property-legal relations are resolved across the entire area – the land is private. Property-legal relations with the access road are resolved.
Price is subject to negotiation. (sale in constructed and operational phase – once that phase is achieved)
The seller intends to sell the entire project.
Status of permits:
2)Location permit
3)Concession right – not required in this part of BiH (private land – official statement)
4)Connection requirements
5)Energy permit not required – since the project is divided into smaller power plants
6)Next step is the construction permit (main project documentation is being prepared)