1)Preliminary consent – for connection to the transmission network

SOLAR POWER PLANT – CAPACITY OF 21 MW (AC)
The project is planned for an output capacity of 21 MW AC. Estimated annual production is 31.73 GWh. Property-legal relations are resolved across the entire area – a concession has been obtained on land owned by public-legal entities and is listed in the land registry. Property-legal relations on the access road are resolved.
Price is subject to negotiation. (sale in constructed and operational phase)
The seller intends to sell the entire project. (in current phase – constructed and operational)
Status of permits:
2)Environmental permit
3)Location permit
4)Concession
5)Connection requirements
6)Construction permit
7)Usage permit (the project is built)
8)PPA concluded – for 1 year
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182