SOLAR POWER PLANT – CAPACITY OF 21 MW (AC)

The project is planned for an output capacity of 21 MW AC. Estimated annual production is 31.73 GWh. Property-legal relations are resolved across the entire area – a concession has been obtained on land owned by public-legal entities and is listed in the land registry. Property-legal relations on the access road are resolved.

Price is subject to negotiation. (sale in constructed and operational phase)

The seller intends to sell the entire project. (in current phase – constructed and operational)

Status of permits:

1)Preliminary consent – for connection to the transmission network

2)Environmental permit

3)Location permit

4)Concession

5)Connection requirements

6)Construction permit

7)Usage permit (the project is built)

8)PPA concluded – for 1 year