1)Preliminary consent – for connection to the transmission network

Green Energy
SOLAR POWER PLANT – CAPACITY OF 140 MW (AC)
The project(s) are planned for an output capacity of 140 MW AC. The estimated annual production is about 247 GWh. Property-legal relations are resolved across the entire area – a concession has been obtained on land owned by public-legal entities and is listed in the land registry. Property-legal relations for the access road have been resolved.
Price is subject to negotiation. (sale in ready-to-build phase)
The seller intends to sell the entire project.
Status of permits:
2)Environmental permit
3)Location permit
4)Concession
5)Connection requirements
6)Energy permit.
7)Construction permit in the process of being obtained
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182